Posted by
kLiPKeRt@sPiNk
at
1:09:00 am
skang ni tgh pening memikirkan mende alah ni ha...
ade sesape jurutera ke ..kontraktor ke..x kesah la sesape pon yg ade idea..
tolong la weh..
huhuuhuhu
susah kot nih! umum gile tajuk ni kn??
Manusia Hawa diciptakan daripada rusuk Adam, bukan dari kepalanya untuk dijunjungi, dan bukan pula dari kakinya untuk dijadikan pengalas, tetapi dari sisinya, untuk dijadikan teman hidupnya, dekat dengan lengannya untuk dilindungi, dan dekat dengan hatinya untuk dicintai.
Popular Posts
-
yes... ape yg korang bace tu betol..memang budak kecik yg masuk berite pasal kene gigit siamang tu sepupu aku! kesian Muhammad Afieq Haz...
-
Selamat Datang ke Perkahwinan V v v v v farah & wan ehh!!! salah wan dan salah farah tu... ok..sekali lagi... SELAMAT DATAN...
-
salam sume... sihat ke kowg ni?? lame x tanye kabo... entry arini ak hanye nk melempiaskan nafsu rase kebimbangan..kerisauan dan kebenganga...
-
aSsALaMUalAIkum sumer... arini ari rabu..rabu yg bertarikh 7hb.. 7hb yg ade kesahnye.. ok..nape pagi2 tapi aku letak gamba ni sbg WorDLESS ...
-
nak tau terik x teriknye... emmm...sendiri bleh tgk kot! hahahahaha motif gamba : nak cakap joho pon panas terik membahang dan me...
-
TARIKH LAHIR KERAMAT!! Kalau anda dilahirkan pada 1Hb, 10Hb, 19Hb, 28Hb dalam mana-mana bulan, anda adalah no.1 Kalau anda dilahirkan pad...
10 comments:
http://www.building-sa.co.za/Build%20Or%20Extend%20A%20Factory.htm
ce try usha
tq ek..
emm TQ incik DA sbb bagi link tue..so cik yuki sile buat bagus2 tugasan itu iyer......
1. dapatkan bajet nak buat kilang.
2. dapatkan info jenis kilang, keperluan kilang macam mesin2...
3. draf design.- approval from owner.
4. site investigation.
5. proper design.
6. Kebenaran PBT.
7. tender.
8. construction.
9. CF
@Nasriq tq weh!
info yg sgt membantu!
weeeeeeee
adakah anda seorg jurutera??
yup...
civil engineer...
tapi reference dekat rumah dekat kl... sekarang outstation di sabah...
mungkin ini boleh membantu...
http://en.wikipedia.org/wiki/Project_management
nanti ubah projek tu kepada nak bina kilang...
@Nasriq
trime kasih daun keladi..
len kali leh mntak tolong lg...
heeeeeeeee
salam ziarah pagi selasa..
Salam kenal dari sumanje...
Oh...ya...
sambil promosikan blog su yang baru...
jemput singgah sini
Thanks so much sudi singgah..
happy blogging from Sumanje
In the performance of these services, the consultant proposed to undertake the studies in three distinct but inter-related phases, namely:-
Phase 1: Data Collection.
Phase 2: Preliminary Engineering Design
Phase 3: Detailed Engineering Design
Phase 4: Tendering Process and Tender Evaluation
Phase 5: Construction and Defect Liability Period
Phase 1 : Data Collection
a) Conceptual design,
b) Site investigation,
c) Soil investigation,
d) Existing structure and drainage,
e) Demarcation of survey corridor and strip contour survey,
f) Traffic assessment and traffic studies (if required),
g) Environmental impact assessment studies (if required),
h) Reports.
Phase 2 : Preliminary Engineering Design
a) Preliminary access and road design,
b) Preliminary hydrological investigation and drainage design,
c) Preliminary geological field investigation,
d) Preliminary water system design,
e) Preliminary sewerage design,
f) Preliminary structural design,
g) Preliminary demarcation of right-of-way,
h) Reports
Phase 3 : Detailed Engineering Design
a) Detail access and road design,
b) Detail hydrological investigation and drainage design,
c) Detail geological (cut and fill work),
d) Detail water system design,
e) Detail sewerage design,
f) Detail structural design,
g) Detail demarcation of right-of-way,
h) Reports
Phase 4 : Tendering Process and Tender Evaluation
a) Advertisement of Tender
b) Site Visit
c) Selling Tender Documents
d) Tender Closed
e) Tender Evaluation
f) Preparing of Tender Reports
g) Tender Award
Phase 5 : Construction Stage
a) Preliminary Works
b) Site Clearing and Earthworks
c) Structural and Drainage Works
d) Sewerage work
e) Water system work
f) Pavement Works
g) Road Furniture and Road Marking Works
h) Landscaping Works
i) Site Meetings
j) Reports
k) Handover
Phase 6 : Defect Liability Period
a) Joint site visits
b) Assessment Reports
c) Supervision of rectification works