macam mane nk bina kilang???sape ade idea?




skang ni tgh pening memikirkan mende alah ni ha...
ade sesape jurutera ke ..kontraktor ke..x kesah  la sesape pon yg ade idea..
tolong la weh..

huhuuhuhu
susah kot nih! umum gile tajuk ni kn??



10 comments:

http://www.building-sa.co.za/Build%20Or%20Extend%20A%20Factory.htm


ce try usha

 

emm TQ incik DA sbb bagi link tue..so cik yuki sile buat bagus2 tugasan itu iyer......

 

1. dapatkan bajet nak buat kilang.
2. dapatkan info jenis kilang, keperluan kilang macam mesin2...
3. draf design.- approval from owner.
4. site investigation.
5. proper design.
6. Kebenaran PBT.
7. tender.
8. construction.
9. CF

 

@Nasriq tq weh!
info yg sgt membantu!
weeeeeeee

adakah anda seorg jurutera??

 

yup...

civil engineer...

tapi reference dekat rumah dekat kl... sekarang outstation di sabah...

 

mungkin ini boleh membantu...

http://en.wikipedia.org/wiki/Project_management

nanti ubah projek tu kepada nak bina kilang...

 

@Nasriq
trime kasih daun keladi..
len kali leh mntak tolong lg...

heeeeeeeee

 

salam ziarah pagi selasa..
Salam kenal dari sumanje...
Oh...ya...

sambil promosikan blog su yang baru...
jemput singgah sini
Thanks so much sudi singgah..
happy blogging from Sumanje

 

In the performance of these services, the consultant proposed to undertake the studies in three distinct but inter-related phases, namely:-
Phase 1: Data Collection.
Phase 2: Preliminary Engineering Design
Phase 3: Detailed Engineering Design
Phase 4: Tendering Process and Tender Evaluation
Phase 5: Construction and Defect Liability Period
Phase 1 : Data Collection
a) Conceptual design,
b) Site investigation,
c) Soil investigation,
d) Existing structure and drainage,
e) Demarcation of survey corridor and strip contour survey,
f) Traffic assessment and traffic studies (if required),
g) Environmental impact assessment studies (if required),
h) Reports.
Phase 2 : Preliminary Engineering Design
a) Preliminary access and road design,
b) Preliminary hydrological investigation and drainage design,
c) Preliminary geological field investigation,
d) Preliminary water system design,
e) Preliminary sewerage design,
f) Preliminary structural design,
g) Preliminary demarcation of right-of-way,
h) Reports

Phase 3 : Detailed Engineering Design

a) Detail access and road design,
b) Detail hydrological investigation and drainage design,
c) Detail geological (cut and fill work),
d) Detail water system design,
e) Detail sewerage design,
f) Detail structural design,
g) Detail demarcation of right-of-way,
h) Reports
Phase 4 : Tendering Process and Tender Evaluation
a) Advertisement of Tender
b) Site Visit
c) Selling Tender Documents
d) Tender Closed
e) Tender Evaluation
f) Preparing of Tender Reports
g) Tender Award
Phase 5 : Construction Stage

a) Preliminary Works
b) Site Clearing and Earthworks
c) Structural and Drainage Works
d) Sewerage work
e) Water system work
f) Pavement Works
g) Road Furniture and Road Marking Works
h) Landscaping Works
i) Site Meetings
j) Reports
k) Handover
Phase 6 : Defect Liability Period
a) Joint site visits
b) Assessment Reports
c) Supervision of rectification works

 

Post a Comment

Jika SENYUM ITU SEDEKAH,
KOMEN YANG BAIK_BAIK ITU JUGA SEDEKAH,
kerana kedua-duanya dapat memberikan sinar kegembiraan kepada orang lain..
=)

Manusia Hawa diciptakan daripada rusuk Adam, bukan dari kepalanya untuk dijunjungi, dan bukan pula dari kakinya untuk dijadikan pengalas, tetapi dari sisinya, untuk dijadikan teman hidupnya, dekat dengan lengannya untuk dilindungi, dan dekat dengan hatinya untuk dicintai.

derma ikhlas

Popular Posts