skang ni tgh pening memikirkan mende alah ni ha...
ade sesape jurutera ke ..kontraktor ke..x kesah la sesape pon yg ade idea..
tolong la weh..
huhuuhuhu
susah kot nih! umum gile tajuk ni kn??
Manusia Hawa diciptakan daripada rusuk Adam, bukan dari kepalanya untuk dijunjungi, dan bukan pula dari kakinya untuk dijadikan pengalas, tetapi dari sisinya, untuk dijadikan teman hidupnya, dekat dengan lengannya untuk dilindungi, dan dekat dengan hatinya untuk dicintai.
Popular Posts
-
The more you have loved and have allowed yourself to suffer because of your love, the more you will be able to let your heart grow wider...
-
aku dah sampai melake!!! yeayyyy!!!! x sabar nak kawennn...eh..x sabar nak tgk org kawen!!! x sabar nak begamb0 byk2 mengalahkan pengantin!!...
-
Waka Waka Shakira You're a good soldier Choosing your battles Pick yourself up And dust yourself off And back in the saddle You'r...
-
1. It hurts to love someone and not be loved in return. But what is more painful is to love someone and ne...
-
ni yg pasal HOW TO IMPROVE YOUR ENGLISH td laa.. ak tnye la soklan ni kt YOUTHSAY.. they gives a lots of useful advices... thankz to u all....
-
ni nk share info bergune yg ak bace kt zabidi.biz Macam mana nak kenal kulit babi? Susah ke nak kenal kulit babi? Jom kita kenali corak kuli...
10 comments:
http://www.building-sa.co.za/Build%20Or%20Extend%20A%20Factory.htm
ce try usha
tq ek..
emm TQ incik DA sbb bagi link tue..so cik yuki sile buat bagus2 tugasan itu iyer......
1. dapatkan bajet nak buat kilang.
2. dapatkan info jenis kilang, keperluan kilang macam mesin2...
3. draf design.- approval from owner.
4. site investigation.
5. proper design.
6. Kebenaran PBT.
7. tender.
8. construction.
9. CF
@Nasriq tq weh!
info yg sgt membantu!
weeeeeeee
adakah anda seorg jurutera??
yup...
civil engineer...
tapi reference dekat rumah dekat kl... sekarang outstation di sabah...
mungkin ini boleh membantu...
http://en.wikipedia.org/wiki/Project_management
nanti ubah projek tu kepada nak bina kilang...
@Nasriq
trime kasih daun keladi..
len kali leh mntak tolong lg...
heeeeeeeee
salam ziarah pagi selasa..
Salam kenal dari sumanje...
Oh...ya...
sambil promosikan blog su yang baru...
jemput singgah sini
Thanks so much sudi singgah..
happy blogging from Sumanje
In the performance of these services, the consultant proposed to undertake the studies in three distinct but inter-related phases, namely:-
Phase 1: Data Collection.
Phase 2: Preliminary Engineering Design
Phase 3: Detailed Engineering Design
Phase 4: Tendering Process and Tender Evaluation
Phase 5: Construction and Defect Liability Period
Phase 1 : Data Collection
a) Conceptual design,
b) Site investigation,
c) Soil investigation,
d) Existing structure and drainage,
e) Demarcation of survey corridor and strip contour survey,
f) Traffic assessment and traffic studies (if required),
g) Environmental impact assessment studies (if required),
h) Reports.
Phase 2 : Preliminary Engineering Design
a) Preliminary access and road design,
b) Preliminary hydrological investigation and drainage design,
c) Preliminary geological field investigation,
d) Preliminary water system design,
e) Preliminary sewerage design,
f) Preliminary structural design,
g) Preliminary demarcation of right-of-way,
h) Reports
Phase 3 : Detailed Engineering Design
a) Detail access and road design,
b) Detail hydrological investigation and drainage design,
c) Detail geological (cut and fill work),
d) Detail water system design,
e) Detail sewerage design,
f) Detail structural design,
g) Detail demarcation of right-of-way,
h) Reports
Phase 4 : Tendering Process and Tender Evaluation
a) Advertisement of Tender
b) Site Visit
c) Selling Tender Documents
d) Tender Closed
e) Tender Evaluation
f) Preparing of Tender Reports
g) Tender Award
Phase 5 : Construction Stage
a) Preliminary Works
b) Site Clearing and Earthworks
c) Structural and Drainage Works
d) Sewerage work
e) Water system work
f) Pavement Works
g) Road Furniture and Road Marking Works
h) Landscaping Works
i) Site Meetings
j) Reports
k) Handover
Phase 6 : Defect Liability Period
a) Joint site visits
b) Assessment Reports
c) Supervision of rectification works